The Queensland Building and Construction Commission's value lines apply to building work valued over A$3,300: home warranty insurance, a written, dated and signed contract, and capped deposits. The rules check on the costs page shows each against the job value you type.

Call (07) 3523 1792

Request a free quote

What floor coating in Toowoomba actually involves

The Commission says home warranty insurance is compulsory for all residential construction work valued at more than A$3,300, counting materials, labour and GST, and that a contract is not required if the work is valued less than that. Whether a given floor coating is building work is not something we say; ask the contractor and read the Commission's pages.

What is guaranteed

The Queensland Government says a supplier guarantees that services will be supplied with due care and skill and that the service will be fit for the specified purpose. If you want the floor for a particular use, such as a workshop or a car, say so when you ask for the quote, because fit for the specified purpose depends on what was specified.

A paint roller on an extension pole leaning against a wall beside a closed bucket on a bare garage slab — floor coating contracts and guarantees, Toowoomba. Illustrative example.

Before work starts

Ask for the contract before work starts, and for the contractor's QBCC number on it and the warranty certificate where one applies. Ask for the colour and finish in writing as well. The class page covers which class names epoxy floors.

These lines are State-wide, so nothing about them is particular to Toowoomba; the local part is the floor, set out on the cracked slabs page and the suburb pages.

Toowoomba epoxy floor costs and rules check

Floor Coating Contracts and Guarantees in Queensland in Toowoomba — common questions

When is a written contract needed?

The Commission says a contract is not required if the work is valued less than A$3,300. For building work above that, it says domestic building contracts must be written, dated and signed by both parties, and agreed to before work begins.

What is guaranteed automatically?

The Queensland Government says a supplier guarantees services will be supplied with due care and skill and that the service will be fit for the specified purpose.

Is there a cooling-off period?

The Commission says all contracts for building work valued at over A$3,300 must include advice about your right to a cooling-off period. The rules check lists the line with its source.